Difference between V-model and Spiral model

Last Updated : 23 Jul, 2025
Comments
Improve
Suggest changes
Like Article
Like
Report

V-Model and Spiral Model both are software development life cycle models. The V-Model is a sequential software development model with concurrent development and testing phases, best for projects with clear requirements and low complexity. On the other hand, the Spiral Model is an iterative, risk-driven approach that handles high complexity and allows for greater flexibility and changes throughout the project lifecycle. Both models are expensive but differ in their flexibility and approach to managing project phases and complexity.

V Model vs Spiral Model

What is V-Model?

The V-model is the most important model that is used in the process of software testing. It is also known as a verification and validation model. It was introduced by the late Paul Rook in the 1980s. V-model is a sequential process in which the next phase begins only after the completion of the present phase. In this model, steps don’t move in a linear way while the steps are bent upwards.


v-model
V-Model

What is Spiral Model?

The Spiral Model is a SDLC model that is highly used for risk-driven models. Based on the risk patterns of a given project, the spiral model helps developers increase the efficiency of model as most risk already handled. It consist of number of loops which form a spiral shape, where each loop is called phase of software development cycle.

Phases of Spiral Model

There are mainly four phases of Spiral Model:

  1. Planning
  2. Risk Analysis
  3. Engineering
  4. Evaluation
spiral-1-1024x945-660
Spiral Model

Difference between V-Model and Spiral Model

AspectV-MODELSPIRAL MODEL
DefinitionV model is software development model but development and testing are concurrent. Spiral model is a software development model and is made with features of incremental, waterfall or evolutionary prototyping models.
TestingIn V-model testing activities start with the first stage. Testing is done in spiral model at the end of the engineering phase.
CostCost of V-model is expensive. Cost of spiral model is also very expensive.
Flexibility to ChangeV-Model has little flexibility to change Flexibility to change in spiral model is high.
SuccessThe V-Model provides a high degree of success. The guarantee of success through Spiral model is low.
User InvolvementIn V-Model user involvement in is only at the beginning. In Spiral Model user involvement is also only at the beginning.

Phases Overlapping

Phases do not overlap.

Phases can Overlap

Complexity Management

Better for projects with clear requirements and low complexity.

Better for projects with high complexity.

Iterative NatureV-Model is not iterative. Spiral Model is iterative.