This term paper presents a biobjective model for production planning in a cement factory using a non-preemptive goal programming approach, focusing on minimizing manufacturing costs while maximizing capacity utilization. The study formulates a linear model and demonstrates its application through specific case studies. The findings indicate that the model can effectively derive optimal allocations of production materials in industrial settings.