R12 Upgrade Approach
        and
  Lessons Learned
 Brian Pellot, AXIA Consulting
Agenda
• Introductions

• R12 Example Projects

• The Upgrade Project

• Lessons Learned

• Major R12 Module Changes

   Please ask questions!!!!!
The Speaker
Founded in 2005, AXIA Consulting is an firm made up of Senior
Consultants averaging 15+ years of Systems Integration
experience.

AXIA has a core group of Oracle consultants currently working
with 6 clients in the region. AXIA also provides strategic
business services, project management and systems integration
services.

Brian Pellot is a senior consultant with 14 years of experience
implementing and upgrading the Oracle Applications. He is also
a past president of OVOAUG.
Current Status
•   Where is everyone now?
    • 11.5.10
    • Earlier versions

•   What modules?
    • Financials
    • Supply Chain
    • Manufacturing

•   How long have you been on Oracle?
     • >2 years
     • >5 years
     • >10 years

•   Who has been through an upgrade (i.e. 11i)?

•   Why upgrade?
    • Support
    • New functionality
    • Implementing additional modules
R12 Overview
•   Oracle’s Major Release after 11i
     •   Various versions have been release semi-annually
     •   R12.0 thru 12.0.6 and 12.1.0 to 12.1.3
     •   Bug fixes
     •   The R12 versions have functional enhancements and changes


•   Major Enhancement
     •   Centralize functions that were common amongst modules
     •   User Interface changes
          •    More Web-based look-and-feel
     •   Common Data screens and functions moved to java framework
          •    Suppliers
          •    Customers
     •   Technology Changes – JRE instead of JInitiator
R12 Projects
Industry`     Public, Regional Ohio            Industrial Equipment               Large Steel
              Utility ($3 Billion)             Manufacturer ($500 Million)        Manufacturer ($2 Billion)
Location      Dayton, OH                       Mason, OH                          West Chester, OH
Versions      12.06                            12.1.2                             12.1.2
Timeline      9 months                         6 months                           9 months

IT Staffing   2 Internal                       5 Internal                         2 Internal
(FTEs)        8 External                       4 External                         3 External
                                               2 Developers                       1 Developer
DBAs          2 Internal                       Outsourced / Hosted                Outsourced
Scope         12 Modules: Financials, Supply   18 Modules: Financials, MFG,       3 Modules; Financials
              Chain, HRMS                      Supply Chain, HRMS
Custom        ~300 custom objects,             ~500 custom objects                ~100 custom objects
Objects       7 complex interfaces             Minimal interfacing                Moderate interfacing
Down          70 hour upgrade window           69 hour upgrade window             48 hour upgrade window
Time
Issues        90 patches, 269 issues logged,   50 patches, 145 SR’s, 418 issues   45 patches, 120 SR’s, 214 issues
              811 test scripts                 logged                             logged
The GOAL
Don’t mess it up!

• Availability
    • The system will be available on Monday morning.

    • Shortest possible downtime.


• Business Continuity
    • On Monday morning everyone can do their job.

    • At the end of the period, the business can close the books.


• Have system on Oracle R12
The Approach
                                Repeat


                   Test                                Production
       Plan                        Test
                   Upgrade                             Upgrade

                                    Issues




                       Cookbook           Patch List
                       Steps


Multiple practice rounds determine correct steps
and patches to ensure a successful upgrade.

More rounds => Less Risk
Sample Plan
Lessons Learned
Project Management
• Agree on scope upfront
• Maintain a “parking lot” for items to be considered after go live
• Maintain an issues list
• Maintain awareness of ongoing 11i Production support changes
• Intermediate milestones
• Weekly DBA meetings

Project Schedule
• Ensure that the project phases and milestones are aligned with important business
    considerations such as quarter end/year end
• Set expectation that going-in schedule is subject to change
• Build in a contingency month if possible
• Initial phase was a “bug hunt” to try and find obvious glitches – try to navigate through
    and test basic functions
• Subsequent upgraded environments serve as “Pilot” systems to help finalize R12
    setups and resolve any bugs
• Following “Pilots”, perform formal tests with business users
Lessons Learned
Custom Objects
• Many will need to change
• Many of the changes will be minor
• Some will be rewrites
• All need to be tested thoroughly
• Some will work with old data but not with new

Testing
• Ensure you have comprehensive test scripts to cover all processes
• Involve the business team – creating test scripts and executing
• Test with “old data” (that was upgraded) and new data
• Be aware of how Subledger Accounting data is converted
• Don’t assume anything – each upgrade iteration brings new 11i data
• Establish a test lab with PC’s so that business team can participate in a focused
   environment
• Test standard and custom report printing
Testing Flow


                    Patch


                   Process      Used in Next
Test    Issue                      Round
                   Change


                Cookbook Step
Cookbook




Cookbook Steps
• Well documented
• Assigned
• Timed
Lessons Learned
Patching
• Take the most recent CPC (critical patch collections) proactively at the start of the
   project
• Evaluate timing of other CPCs and new releases as the project progresses
• Track every patch applied in every environment
    - you won’t want to take all of them forward
    - Important to know what’s where if you have more than one instance
• Set a “patch freeze” date prior to the cutover event
• Be aware of patches for a single bug that might contain additional bug fixes. If “one
   off” patches are unavailable, you must re-test all affected files.
• List of specific patches for specific issues can be provided

Training
• Depends on number of users, number of testers, use of modules
• Some modules had no training – HR
• Some had full classroom training – AP, Inv
• Some fell in the middle – GL, AR
• Some do remedial training
Lessons Learned
If you have interfaces consider this carefully! Oracle will be (partially) down.

Interface Plan
• What systems will be affected by downtime?
      • Linked systems
      • Interface files to those systems.

•   ODBC links/users – turn them off – The DB will be up!

•   Process every file and every transaction
     • Once and
     • Only once
     • Will there be format changes or program changes?

•   Mitigate the impacts

•   Assign specific actions for each interface
     • Who will process files?
     • When will the files be processed?
     • Who needs to know about what affect to what systems?
Lessons Learned
Cutover Event
• Cutover planning starts early in the project
• Communicate, Communicate, Communicate –
     •   No surprises
     •   Assume nothing
•   “Cutover Plan” - instructions should be detailed enough that others could do the steps
    in someone’s absence
•   Assign the steps – consider passwords and responsibilities (security)
•   Practice the steps with each technical upgrade
•   Time the steps, automate if possible using Dataloader, SQL, FNDLOAD
•   Develop communication plan, fallback plan, 24x7 contact list (including key third-party
    vendors), Go/no-go decision support
•   Allow time for business team to do some basic testing before the system is open for
    business on the first day after cutover
•   Manage the impact to interfaced systems (inbound and outbound)

                 This is what we’ve
                 trained for people!
Lessons Learned
Experience
• Companies considering an upgrade have experienced Oracle Application teams.

•   Find someone experienced with the upgrade.

•   The upgrades get quicker and less risky as more upgrade experienced people
    become available to help.

•   Experienced people should provide a head start.
          • Cookbook
          • Patch lists
          • Key risk areas – what to test first
          • Coding change examples
          • XML Template examples (checks and other payment documents)
          • Templates for other project deliverables
              • Project plan
              • Impact documents
              • Starting points for cutover plan
Results
 STATISTIC – AP and Payments modules comprised a large portion of
 the project issues and patches.

1 in every 6 issues                           Almost 1/3 of patches
             Project Issues Log                        Applications Patches

         AP, Payments    Other Modules              AP, Payments    Other Modules




12.0.6 project - 35 Oracle Service Requests (SR’s) for AP/IBY modules
The number was much less for the 12.1.2 project.
New in R12
                          Dr   Cr


6 Major Initiatives                              General & Ledger
                                                 Ledger Ledger
                                                       Sets
1. Ledger and
   Ledger Sets
                                          Subledger Accounting (SLA)
2. Subledger
   Accounting                    Tax                       Inter                      Bank
                                Engine                   Company
                                                                                      Model
3. MOAC
4. Intercompany
5. Tax Engine           Multi-Org
                         Access
6. Bank Model            Control
                                     Inventory           Receivables           Projects


                        Work in Process       Purchasing            Payables                  19
Major Changes
Payables
• 11i Payables split into 4 parts in R12
    • Payables
    • Payments
    • Tax                                                             Who moved my
    • Accounting - SLA
                                                                      cheese?
• Supplier form re-written
• Bank data centralized
• Lines added
• Trial balance and write-offs different with some upgrade concerns

Payments
• All new module
• Some development required
• Numerous setups

WebADI
• Client ADI is gone
• Other modules can be used to fill the gaps.
Major Changes
Subledger Accounting
• Create accounting process added to all financial modules
• Affects GL Drill-back
• Some date idiosyncrasies
• Powerful capabilities available (but not required)
• One accounting method change means full new method – decide early

EBTax
• Regime will upgrade but don’t use it!
    • Not supported
    • Not extendable
    • Difficult to use
• Set up a new regime
• Good time to go to a 3rd party provider
• Lots of power – lots of learning

Printing Architecture and BI Publisher
• PASTA is available but not exact
• Some reports need to be opened and printed from Adobe
Questions?

For more information, please contact:


                           Brian Pellot
                        AXIA Consulting
                 Brian.Pellot@axiaconsulting.net

                   http://www.axiaconsulting.net

More Related Content

PDF
10 Tips for Successful 12.2 Upgrade
PDF
EBS-technical_upgrade_best_practices 12.1 or 12.2
PDF
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2
PPTX
Oracle E-Business Suite 12.2 - The Upgrade to End All Upgrades
PPTX
Oracle Project Financial Management Cloud in 9 Weeks
PDF
Preparing for EBS R12.2-upgrade-full
DOCX
Prepayments "Oracle Property Manager"
PPTX
Oracle Ebiz R12.2 Features -- Ravi Sagaram
10 Tips for Successful 12.2 Upgrade
EBS-technical_upgrade_best_practices 12.1 or 12.2
OOW15 - Planning Your Upgrade to Oracle E-Business Suite 12.2
Oracle E-Business Suite 12.2 - The Upgrade to End All Upgrades
Oracle Project Financial Management Cloud in 9 Weeks
Preparing for EBS R12.2-upgrade-full
Prepayments "Oracle Property Manager"
Oracle Ebiz R12.2 Features -- Ravi Sagaram

What's hot (20)

PDF
Oracle Unified Method (OUM)
PDF
Oracle financials functional training on ap, ar & gl
PPT
Oracle Fusion Application
DOCX
Aim vs oum documents
PPT
Oracle Fusion Applications Accounts Payables
DOCX
Oracle GL Period Closing
PPTX
Automating Your Clone in E-Business Suite R12.2
PPT
Oracle property manager
PPTX
Oracle Fusion functional setup manager
PPTX
Take the Next Step to S/4HANA with "RISE with SAP"
PPTX
SAP BASIS Practice Exam
PPT
Best Implementation Practices with BI Publisher
PPT
R12 Oracle Inventory Management, New Features
PDF
SAP Integration: Best Practices | MuleSoft
PPT
Oracle Shop Floor Management R12
PPTX
Oracle EBS Upgrade to 12.2.5.1
PPT
Oracle Fusion Financials Overview
ODP
Introduction to Oracle Financials
DOCX
Mass Allocations
PDF
E-Business Tax Purchasing Whitepaper
Oracle Unified Method (OUM)
Oracle financials functional training on ap, ar & gl
Oracle Fusion Application
Aim vs oum documents
Oracle Fusion Applications Accounts Payables
Oracle GL Period Closing
Automating Your Clone in E-Business Suite R12.2
Oracle property manager
Oracle Fusion functional setup manager
Take the Next Step to S/4HANA with "RISE with SAP"
SAP BASIS Practice Exam
Best Implementation Practices with BI Publisher
R12 Oracle Inventory Management, New Features
SAP Integration: Best Practices | MuleSoft
Oracle Shop Floor Management R12
Oracle EBS Upgrade to 12.2.5.1
Oracle Fusion Financials Overview
Introduction to Oracle Financials
Mass Allocations
E-Business Tax Purchasing Whitepaper
Ad

Viewers also liked (20)

PPT
ORACLE EBS R12 UPGRADE
PDF
10 tips for successful 12.2 upgrade
PPTX
types and classification of dental implants
PPTX
Best New Features of Oracle Database 12c
PPT
Planning for New Hospital
PDF
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
PPT
Social Media Marketing PowerPoint Presentation
PPT
Differences R12 Vs 11i.5.10
PPTX
6 basic steps of software development process
PPT
10 Best Practices for Workflow Design
PDF
Mystic Monk Coffee case
DOCX
Microeconomics paper (undergrad)
DOC
Case Study #1
DOCX
Design of Transmission Tower
PPT
History of Graffiti
PPTX
Report exp 6 and 7 (DNA and RNA)
PPTX
Special test for dermatomes and myotomes
PPTX
Credit cards
PDF
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
PDF
Basics of Coding in Pediatrics Medical Billing
ORACLE EBS R12 UPGRADE
10 tips for successful 12.2 upgrade
types and classification of dental implants
Best New Features of Oracle Database 12c
Planning for New Hospital
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
Social Media Marketing PowerPoint Presentation
Differences R12 Vs 11i.5.10
6 basic steps of software development process
10 Best Practices for Workflow Design
Mystic Monk Coffee case
Microeconomics paper (undergrad)
Case Study #1
Design of Transmission Tower
History of Graffiti
Report exp 6 and 7 (DNA and RNA)
Special test for dermatomes and myotomes
Credit cards
mpx Replay, Expedite Your Catch-Up and C3 Workflow 2 of 2
Basics of Coding in Pediatrics Medical Billing
Ad

Similar to Oracle R12 Upgrade Lessons Learned (20)

PPTX
SOA Suite 11g Project Experience - FDUG Meeting - November 14 2013
PPTX
Sage Project Management
PPTX
Patching is Your Friend in the New World Order of EPM and ERP Cloud
PPTX
Why retail companies can't afford database downtime
PDF
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
PDF
Project Sherpa: How RightScale Went All in on Docker
PDF
Run Your Oracle BI QA Cycles More Effectively
PPTX
Change Management in Hybrid landscapes 2017
PPTX
Stockholm AUG 18.9.2014 Nordea
DOC
Mohd_Shaukath_5_Exp_Datastage
PDF
ANIn Navi Mumbai Jan 2023 | Agile- 360 degree perspective by Pravin Mukhedkar
DOC
Madhu_Resume
PDF
Lessons Learned from Large Scale Adoption of DevOps for IBM z Systems Software
PPT
Sysdev
DOC
DOC
Rajesh Paleru
PDF
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
PPT
Manual Software testing - software development life cycle
PDF
Winning performance challenges in oracle standard editions
DOC
Harikrishna yaddanapudi
SOA Suite 11g Project Experience - FDUG Meeting - November 14 2013
Sage Project Management
Patching is Your Friend in the New World Order of EPM and ERP Cloud
Why retail companies can't afford database downtime
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Project Sherpa: How RightScale Went All in on Docker
Run Your Oracle BI QA Cycles More Effectively
Change Management in Hybrid landscapes 2017
Stockholm AUG 18.9.2014 Nordea
Mohd_Shaukath_5_Exp_Datastage
ANIn Navi Mumbai Jan 2023 | Agile- 360 degree perspective by Pravin Mukhedkar
Madhu_Resume
Lessons Learned from Large Scale Adoption of DevOps for IBM z Systems Software
Sysdev
Rajesh Paleru
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Manual Software testing - software development life cycle
Winning performance challenges in oracle standard editions
Harikrishna yaddanapudi

Recently uploaded (20)

PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Approach and Philosophy of On baking technology
PDF
cuic standard and advanced reporting.pdf
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Empathic Computing: Creating Shared Understanding
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PPTX
SOPHOS-XG Firewall Administrator PPT.pptx
PDF
Getting Started with Data Integration: FME Form 101
PPTX
A Presentation on Artificial Intelligence
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
MYSQL Presentation for SQL database connectivity
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Reach Out and Touch Someone: Haptics and Empathic Computing
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Programs and apps: productivity, graphics, security and other tools
Accuracy of neural networks in brain wave diagnosis of schizophrenia
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Approach and Philosophy of On baking technology
cuic standard and advanced reporting.pdf
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Encapsulation_ Review paper, used for researhc scholars
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Empathic Computing: Creating Shared Understanding
Assigned Numbers - 2025 - Bluetooth® Document
SOPHOS-XG Firewall Administrator PPT.pptx
Getting Started with Data Integration: FME Form 101
A Presentation on Artificial Intelligence
20250228 LYD VKU AI Blended-Learning.pptx
MYSQL Presentation for SQL database connectivity
“AI and Expert System Decision Support & Business Intelligence Systems”
Profit Center Accounting in SAP S/4HANA, S4F28 Col11

Oracle R12 Upgrade Lessons Learned

  • 1. R12 Upgrade Approach and Lessons Learned Brian Pellot, AXIA Consulting
  • 2. Agenda • Introductions • R12 Example Projects • The Upgrade Project • Lessons Learned • Major R12 Module Changes Please ask questions!!!!!
  • 3. The Speaker Founded in 2005, AXIA Consulting is an firm made up of Senior Consultants averaging 15+ years of Systems Integration experience. AXIA has a core group of Oracle consultants currently working with 6 clients in the region. AXIA also provides strategic business services, project management and systems integration services. Brian Pellot is a senior consultant with 14 years of experience implementing and upgrading the Oracle Applications. He is also a past president of OVOAUG.
  • 4. Current Status • Where is everyone now? • 11.5.10 • Earlier versions • What modules? • Financials • Supply Chain • Manufacturing • How long have you been on Oracle? • >2 years • >5 years • >10 years • Who has been through an upgrade (i.e. 11i)? • Why upgrade? • Support • New functionality • Implementing additional modules
  • 5. R12 Overview • Oracle’s Major Release after 11i • Various versions have been release semi-annually • R12.0 thru 12.0.6 and 12.1.0 to 12.1.3 • Bug fixes • The R12 versions have functional enhancements and changes • Major Enhancement • Centralize functions that were common amongst modules • User Interface changes • More Web-based look-and-feel • Common Data screens and functions moved to java framework • Suppliers • Customers • Technology Changes – JRE instead of JInitiator
  • 6. R12 Projects Industry` Public, Regional Ohio Industrial Equipment Large Steel Utility ($3 Billion) Manufacturer ($500 Million) Manufacturer ($2 Billion) Location Dayton, OH Mason, OH West Chester, OH Versions 12.06 12.1.2 12.1.2 Timeline 9 months 6 months 9 months IT Staffing 2 Internal 5 Internal 2 Internal (FTEs) 8 External 4 External 3 External 2 Developers 1 Developer DBAs 2 Internal Outsourced / Hosted Outsourced Scope 12 Modules: Financials, Supply 18 Modules: Financials, MFG, 3 Modules; Financials Chain, HRMS Supply Chain, HRMS Custom ~300 custom objects, ~500 custom objects ~100 custom objects Objects 7 complex interfaces Minimal interfacing Moderate interfacing Down 70 hour upgrade window 69 hour upgrade window 48 hour upgrade window Time Issues 90 patches, 269 issues logged, 50 patches, 145 SR’s, 418 issues 45 patches, 120 SR’s, 214 issues 811 test scripts logged logged
  • 7. The GOAL Don’t mess it up! • Availability • The system will be available on Monday morning. • Shortest possible downtime. • Business Continuity • On Monday morning everyone can do their job. • At the end of the period, the business can close the books. • Have system on Oracle R12
  • 8. The Approach Repeat Test Production Plan Test Upgrade Upgrade Issues Cookbook Patch List Steps Multiple practice rounds determine correct steps and patches to ensure a successful upgrade. More rounds => Less Risk
  • 10. Lessons Learned Project Management • Agree on scope upfront • Maintain a “parking lot” for items to be considered after go live • Maintain an issues list • Maintain awareness of ongoing 11i Production support changes • Intermediate milestones • Weekly DBA meetings Project Schedule • Ensure that the project phases and milestones are aligned with important business considerations such as quarter end/year end • Set expectation that going-in schedule is subject to change • Build in a contingency month if possible • Initial phase was a “bug hunt” to try and find obvious glitches – try to navigate through and test basic functions • Subsequent upgraded environments serve as “Pilot” systems to help finalize R12 setups and resolve any bugs • Following “Pilots”, perform formal tests with business users
  • 11. Lessons Learned Custom Objects • Many will need to change • Many of the changes will be minor • Some will be rewrites • All need to be tested thoroughly • Some will work with old data but not with new Testing • Ensure you have comprehensive test scripts to cover all processes • Involve the business team – creating test scripts and executing • Test with “old data” (that was upgraded) and new data • Be aware of how Subledger Accounting data is converted • Don’t assume anything – each upgrade iteration brings new 11i data • Establish a test lab with PC’s so that business team can participate in a focused environment • Test standard and custom report printing
  • 12. Testing Flow Patch Process Used in Next Test Issue Round Change Cookbook Step
  • 13. Cookbook Cookbook Steps • Well documented • Assigned • Timed
  • 14. Lessons Learned Patching • Take the most recent CPC (critical patch collections) proactively at the start of the project • Evaluate timing of other CPCs and new releases as the project progresses • Track every patch applied in every environment - you won’t want to take all of them forward - Important to know what’s where if you have more than one instance • Set a “patch freeze” date prior to the cutover event • Be aware of patches for a single bug that might contain additional bug fixes. If “one off” patches are unavailable, you must re-test all affected files. • List of specific patches for specific issues can be provided Training • Depends on number of users, number of testers, use of modules • Some modules had no training – HR • Some had full classroom training – AP, Inv • Some fell in the middle – GL, AR • Some do remedial training
  • 15. Lessons Learned If you have interfaces consider this carefully! Oracle will be (partially) down. Interface Plan • What systems will be affected by downtime? • Linked systems • Interface files to those systems. • ODBC links/users – turn them off – The DB will be up! • Process every file and every transaction • Once and • Only once • Will there be format changes or program changes? • Mitigate the impacts • Assign specific actions for each interface • Who will process files? • When will the files be processed? • Who needs to know about what affect to what systems?
  • 16. Lessons Learned Cutover Event • Cutover planning starts early in the project • Communicate, Communicate, Communicate – • No surprises • Assume nothing • “Cutover Plan” - instructions should be detailed enough that others could do the steps in someone’s absence • Assign the steps – consider passwords and responsibilities (security) • Practice the steps with each technical upgrade • Time the steps, automate if possible using Dataloader, SQL, FNDLOAD • Develop communication plan, fallback plan, 24x7 contact list (including key third-party vendors), Go/no-go decision support • Allow time for business team to do some basic testing before the system is open for business on the first day after cutover • Manage the impact to interfaced systems (inbound and outbound) This is what we’ve trained for people!
  • 17. Lessons Learned Experience • Companies considering an upgrade have experienced Oracle Application teams. • Find someone experienced with the upgrade. • The upgrades get quicker and less risky as more upgrade experienced people become available to help. • Experienced people should provide a head start. • Cookbook • Patch lists • Key risk areas – what to test first • Coding change examples • XML Template examples (checks and other payment documents) • Templates for other project deliverables • Project plan • Impact documents • Starting points for cutover plan
  • 18. Results STATISTIC – AP and Payments modules comprised a large portion of the project issues and patches. 1 in every 6 issues Almost 1/3 of patches Project Issues Log Applications Patches AP, Payments Other Modules AP, Payments Other Modules 12.0.6 project - 35 Oracle Service Requests (SR’s) for AP/IBY modules The number was much less for the 12.1.2 project.
  • 19. New in R12 Dr Cr 6 Major Initiatives General & Ledger Ledger Ledger Sets 1. Ledger and Ledger Sets Subledger Accounting (SLA) 2. Subledger Accounting Tax Inter Bank Engine Company Model 3. MOAC 4. Intercompany 5. Tax Engine Multi-Org Access 6. Bank Model Control Inventory Receivables Projects Work in Process Purchasing Payables 19
  • 20. Major Changes Payables • 11i Payables split into 4 parts in R12 • Payables • Payments • Tax Who moved my • Accounting - SLA cheese? • Supplier form re-written • Bank data centralized • Lines added • Trial balance and write-offs different with some upgrade concerns Payments • All new module • Some development required • Numerous setups WebADI • Client ADI is gone • Other modules can be used to fill the gaps.
  • 21. Major Changes Subledger Accounting • Create accounting process added to all financial modules • Affects GL Drill-back • Some date idiosyncrasies • Powerful capabilities available (but not required) • One accounting method change means full new method – decide early EBTax • Regime will upgrade but don’t use it! • Not supported • Not extendable • Difficult to use • Set up a new regime • Good time to go to a 3rd party provider • Lots of power – lots of learning Printing Architecture and BI Publisher • PASTA is available but not exact • Some reports need to be opened and printed from Adobe
  • 22. Questions? For more information, please contact: Brian Pellot AXIA Consulting [email protected] http://www.axiaconsulting.net